WINNINGTON ROAD

Contract Period 41 weeks

This project is a single new build dwelling on the prestigious Winnington Road in the Hampstead Garden Suburbs. It consists of a multi-level basement and podium transfer slab.

We have delivered the multi-level basement including the temporary works and bulk excavation for the formation of the basement.

Careful planning of site logistics was needed including organising materials and plant delivery and muck away as the basement footprint effectively fills the width of the site. We worked closely with the designers on this project to ensure that we could best utilise the space during the construction phase.

Digger icon

2917 m3 of muck removed off site

land-icon

325.17 tonnes of reinforcement used

water-icon

1205 m3 of concrete used

waste-icon

98.92% of waste diverted from landfill